VANCOUVER, BC, May 14, 2026 - Banyan Gold Corp. (the "Company" or "Banyan") (TSX-V: BYN) (OTCQB: BYAGF) is pleased to release the final drill results and provide a comprehensive summary of the 2025 AurMac delineation drill program. The 42,000 metres (“m”) program included 178 drillholes at the AurMac Project, with the primary goal of the 2025 drill program to maximize economic potential for the upcoming Preliminary Economic Assessment (“PEA”; expected second half of 2026) by targeting high-grade domain and mineralized envelope extensions, and waste block conversion. Drilling took place from March 27, 2026, to November 10, 2026. Drill results throughout AurMac consistently intersected high-grade gold (“Au”) mineralization, including well mineralized sheeted quartz vein domains hosting Bismuth-sulphosalts and visible gold throughout the core of the Powerline Deposit (“Powerline”). Very high-grade gold mineralization associated with sulphide replacement and skarn-style mineralization in the Airstrip Deposit (“Airstrip”) were intersected in a core high-grade contact zone between calcareous metasedimentary rocks and a felsic aplite dyke. These findings follow up on drilling conducted in 2024 (see news release dated February 19, 2025).
Read the rest of the news HERE
